Geofizyka Torun (GT) is carrying a contract for BARG ARTGEO on the Oder River
GT performs drilling works on the Oder river from a hydraulically stabilized floating platform. Core exploration holes are drilled with natural intact structure sampling in the path of newly designed S6 expressway. The order includes drilling 23 holes with depths ranging from 55.0 m to 71.5 m
in the line of the designed tunnel under the Oder River.

p7PC2pm9vR0
Other news

25 September 2023
Visit GT stand at ADIPEC 2023
READ MORE

20 June 2023
GT is a partner of the Polish Wind Energy Association 2023 conference
READ MORE

14 June 2023
GT at EAGE 2023
READ MORE

26 May 2023
GT awarded for commitment and performance in HSE for the Exploration process during 2022
READ MORE